- REMOVING OF OLD (MAKE-NGF) 33 KV PANEL (83 NOS) AND 220 KV CRP (21 NOS) AND INSTALLATION, ERECTION AND TESTING COMMISSIONING OF NEW SIEMENS MAKE 33KV (88 NOS) WITH 220 KV CRP (20) NOS) OF WITHIN 24 DAYS AT JINDAL STEEL LTD DOLVI PEN MAHARASTRA.
- TESTING AND COMMISSIONING OF MV/LV PANELS. APPROX = 600 NOS.SIPROTEC NUMERICAL RELAYS.
- COMMISSIONING OF 66/132 KV EHV BKR. APPROX =65 NOS.
- MAINTENANCE OF MV/LV SWITCHGEARS. APPROX = 450 NOS.
PROG. & PARAM.OF LOOSE SIPROTEC RELAYS.